Skip to main content

Posts

Featured

How Long Does Commercial AC Installation Take?

It is difficult to answer the question:   how long does commercial AC installation take?   The main reason for the difficulty is all the variables involved in the installation.   Size of the building needs to be taken into consideration.   Another factor is whether or not all or additional ductwork will need to be installed along with the new air conditioning unit. An air conditioner system normally will entail more than just the air conditioner unit. An air conditioner system installation will include both the AC unit and the ductwork to provide the air flow to business or residence.   A valid time estimate for a complete air conditioner system installation would be approximately three days for completion.   This time frame would allow for one day to change over the AC unit and two additional days to connect and install the ductwork.   In the event that additional ductwork beyond the original installation is necessary, then the time estimate would move to three or four days.

Latest Posts